Harrison Medical Center
Acute Care Expansion
As the energy modeler, SEG assisted Affiliated Engineers and NBBJ with heating and cooling loads analysis and energy modeling for code compliance and utility incentives.
Project Details
The Silverdale Hospital set a goal of achieving an energy use index (EUI) less than 100 kBtu/sf-yr for its new 500,000 square foot acute care facility. As designed, the project is predicted to have a EUI of 98.2 kBtu/sf-yr. The project meets this ambitious target through the use of a heat recovery chiller coupled with heat recovery from exhaust air, enhanced insulation, aggressive HVAC controls, and advanced lighting design and controls.
SHARE